Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • A-Z A-Z
    • A
    • Annual Reports
    • K
    • KForms
CDOT Logo
News
You are here:
  1. Home
  2. News
  3. 2019
  4. July
  5. Assets
Navigation
  • CDOT Media Room
  • 2023
  • 2022
  • 2021
  • Denver Metro/Central Colorado
  • Southeastern Colorado News
  • Northwestern Colorado News
  • Northeastern Colorado News
  • Southwestern Colorado News
  • Traffic Safety News
  • Statewide News
  • Statewide News Archive
  • CSV Content Report August 26, 2022
  • 2019
    • July
      • Safety Improvement Project at Hanging Lake Tunnel Begins Next Week
      • Crews to clear mounting debris from bridges on US 550  south of Montrose
      • CDOT hosting July 17 Southwest/South Central Colorado-focused telephone town hall
      • CDOT to begin improving Greenland Road interchange for I-25 South Gap project
      • CDOT to begin work on improving the Greenland Road interchange as part of the I-25 South Gap project
      • One-day closure set for US 40 in Craig
      • CDOT to install remote avalanche control system on US 50 Monarch Pass
      • CDOT Names Nick Farber as Director of High Performance Transportation Enterprise
      • Southwest Colorado CO 145 Rock Slide: Reconstruction of Destroyed Highway Completed
      • Assets
        • CO 92 Chip seal 7-3-19.png
        • CO 145 7-3-19.jpg
        • Highway 133 at MP 29.7 rock mitigation.PNG
        • 35 Ramps 7-5-19.jpg
        • US 50 Gunnison 7-3-19.png
        • US 550 2 7-1-19.jpg
        • us 550 1 7-1-19.jpg
        • US 6 A 7-8-19.png
        • US 6 7-8-19.png
        • CO 325 Bank Failure (2).jpg
        • I-25 Gap Traffic Pattern 7-18-19.png
        • Craig 7-17-19.jpg
        • peoria off-ramp detour.jpg
        • US 50 milling map 7-23.png
        • I-70 S Canyon Mudslide.02 (1).jpg
        • I-70 S Canyon Mudslide.01 (1).jpg
        • I-25 ramp metering 7-31-19.jpg
        • US 50 Monarch Pass Remote Av Control MAP
Assets https://winter.codot.gov/news/2019/july/assets https://winter.codot.gov/@@site-logo/siteLogo.png

Assets

Title Type
CO 92 Chip seal 7-3-19.png Image
CO 145 7-3-19.jpg Image
Highway 133 at MP 29.7 rock mitigation.PNG Image
35 Ramps 7-5-19.jpg Image
US 50 Gunnison 7-3-19.png Image
US 550 2 7-1-19.jpg Image
us 550 1 7-1-19.jpg Image
US 6 A 7-8-19.png Image
US 6 7-8-19.png Image
Overnight full off-ramp closures on US 6: I-25 to Perry Street project News Item
CO 325 Bank Failure (2).jpg Image
I-25 Gap Traffic Pattern 7-18-19.png Image
Craig 7-17-19.jpg Image
peoria off-ramp detour.jpg Image
US 50 milling map 7-23.png Image
I-70 S Canyon Mudslide.02 (1).jpg Image
I-70 S Canyon Mudslide.01 (1).jpg Image
US 50 Av Control system 7-30-19.png Image
I-25 ramp metering 7-31-19.jpg Image
US 50 Monarch Pass Remote Av Control MAP Image

 Contact CDOT

Resources
  • CDOT Media Room
  • CDOT YouTube Videos
  • Statewide News Archive
Stay Informed!

Travel Alerts header

Contact Us Contact Us Phone Icon 511 Icon
  • © 2022 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo