Southeastern Colorado Pavement Marking

About the Project:

The Colorado Department of Transportation, in partnership with Kolbe Striping Inc., will resume restriping work on March 28 throughout southeastern Colorado. This project involves striping over existing pavement markings on both asphalt and concrete pavement types; these new white and yellow markings will match existing pavement lines. Work is scheduled to be completed by late-May 2022.

The following highways will be worked upon: I-25, US 50, CO 115, and CO 285; these highways run through the following counties: Park, El Paso, Pueblo, Otero, and Freemont.


Work Schedule

  • Work is scheduled to resume on March 28 and is expected to last until late May 2022.  
  • Normal working hours will be on Monday through Friday from 7:00 a.m. to 5:00 p.m. for striping work on US 50 and CO 115.
  • Night work is scheduled for I-25, between milemarkers 102.3 – 163.32, for April 17 – May 4 and for CO 285, between milemarkers 187-225.15 for May 8-22. Night work hours will be from 8:00 p.m. to 4:00 a.m.

Traffic Impacts

  • Generally, traffic impacts should be minimal as this is a mobile operation. Drivers may expect delays are asked to exercise patience when encountering the mobile pavement marking zone.
  • Mobile traffic control will be used in work zones with slow moving directional traffic.
  • Use caution and slower speeds when traveling through the work zone as there will be wet paint throughout.

Project Facts

  • Contractor: Kolbe Striping
  • Timeline: December 2021 - May 2022
  • Location: I-25A, US 50B, US 50Z, CO 115A, and CO 285D in Pueblo, Park, El Paso, Otero and Fremont Counties

SE CO Striping project map

Click image to enlarge.