US 24 Woodland Park Paving and ADA Curb Ramp Improvements

About the Project:

he Colorado Department of Transportation and contractor Kiewit are installing ADA (Americans with Disabilities Act) curb ramps and guardrail in Woodland Park. They will also be resurfacing US 24 between Divide and Chipita Park. The anticipated completion date is November 2023.

Forty-four ADA curb ramps will be installed in Woodland Park at the following locations:

US 24 and Lafayette Avenue
US 24 and Browning St
US 24 and Elm Street
US 24 and Maple Street
US 24 and Midland Avenue
US 24 and Pine Street
US 24 and Center Street
US 24 and Park Street
US 24 and Fairview Street
US 24 and Grace Street
US 24 and Pike Peak Avenue
US 24 and Chester Avenue
US 24 and Sonic/McDonalds Alley
US 24 and Paradise Circle North
US 24 and Trull Road
US 24 and Morning Sun Drive


Benefits of Project:

  • Curb ramps will make pedestrian crossing safer and accessible for everyone
  • Guardrail will prevent cars from leaving the roadway
  • Resurfacing will improve the long-term condition of the roadway and improved quality for motorists driving experience.

Work Schedule:

  • Nighttime work –Sunday to Thursday, 7 p.m. to 7 a.m.

Detailed Traffic Impacts:

  • Alternating and single lane closures
  • Speed limit is reduced to 45 MPH through the construction zone

Work this Week & Lane Closures
US 24 Woodland Park Resurfacing

Project Facts

  • Cost: $5 Million
  • Contractor: Kiewit Infrastructure Co.
  • Timeline: April - November 2023
  • Location: US 24 Woodland Park in Teller County (MP 278.19 - 291.38)

US 24 Curb Ramps Project Location

US 24 Woodland Park project location on US 24  in El Paso County