US 85 Platteville Resurfacing Between CO 60 and CO 66
About the Project:
This project will improve US Highway 85 near Platteville. Over three miles of northbound and southbound US 85 (Mile Points 250.5 – 254.0) will receive a new asphalt surface. The project will also extend the northbound US 85 left-turn lane at Colorado Highway 60, construct intersection safety improvements at Marion Avenue, and upgrade striping and signage throughout the corridor. A center median will be added at Marion Avenue to limit access to right-in, right-out on all approaches except northbound US 85 where left turns will still be possible onto Marion Avenue.
Project Benefits
- Improve highway safety
- Provide smoother driving surface and increase longevity of the highway
Work Schedule:
- Phased construction from May – November 2023
- Crews will primarily work during daylight hours Monday through Friday
- Night and weekend work are possible
Traffic Impacts:
Motorists can expect the following impacts during the period of construction:
- Expect intermittent lane closures and traffic shifts
- Watch for vehicles entering and exiting the work zone
- US 85 will remain open during construction
- Expect various mobile construction operations within the work zone
- Refer to COtrip.org for real-time travel conditions and road closures
Work this Week & Lane Closures
US 85 Platteville Resurfacing
Project Facts
- Construction Cost: $5.1 Million
- Contractor: Asphalt Specialties Company
- Timeline: May through November 2023
- Location: US 85 Between CO 60 and CO 66
- Nearest Town/City: Platteville
- Mile Point(s): 250.5 to 254
- County: Weld